Bastau build group
Tel/Fax: +7 7172 655-424; +7 708 655-0044
каз русeng
  • Home
  • About
    • Contacts
  • Services
  • News
  • Objects
  • Media
    • Photo
    • Video
bgr
  • The hotel Beijing Palace - excavation depth 13.5 meters.
    The hotel "Beijing Palace"- excavation depth 13.5 meters.
  • Multifunctional residential complex Abu Dhabi Plaza - excavation depth 15 meters.
    Multifunctional residential complex "Abu Dhabi Plaza"- excavation depth 15 meters.
  • Underground parking - excavation depth 12 meters.
    Underground parking lot - excavation depth 12 meters.
  • The hotel Beijing Palace - excavation depth 13.5 meters.
    The hotel "Beijing Palace"- excavation depth 13.5 meters.
  • Business Center Moscow- excavation depth 9 meters.
    Business Center "Moscow"- excavation depth 9 meters.
Home / Services / Installation of external engineering networks and constructions / Catalog

Installation of external engineering networks and constructions


  • General earthworks
  • «Diaphragm Walling» method
  • Installation of external engineering networks and communications
  • Special equipment services
  • Machinery for rent
  • Vertical planning

Трактор бульдозер гусеничный KOMATSU D65E-12
Трактор бульдозер гусеничный KOMATSU D65E-12
Автогрейдер САТ 160 К
Автогрейдер САТ 160 К
Dozer Caterpillar (CAT) D8R
Dozer Caterpillar (CAT) D8R
Blade width,
3.94-4.98 m
Total weight,
37.8 tons
Power,
328 hp
Track excavator Caterpillar (CAT) 329DL
Track excavator Caterpillar (CAT) 329DL
Total weight,
29.7 tons
Bucket Capacity,
0.94 - 2.6 m3
Dozer Caterpillar D6K XL
Dozer Caterpillar D6K XL
Total weight,
12.89 tons
Power,
127 hp
Drum compactor САТ CS 74 - 16t
Drum compactor САТ CS 74 - 16t
Total weight,
16 000 kg
Dozer Caterpillar D6N
Dozer Caterpillar D6N
Blade width,
(3154-3272)x -XL / 4080x -LGP
Total weight,
16668-XL/17797-LGP
Power,
111,8
Digging depth,
473,5-XL / 359,5-LGP
Track excavator CAT 324DL
Track excavator CAT 324DL
Total weight,
25600 kg
Power,
140 kWh (190 hp)
Bucket Capacity,
1,5 m3
Track excavator Caterpillar 320D
Track excavator Caterpillar 320D
Total weight,
20500-21750 kg
Power,
103 kWh
Excavator 326 D 2 L
Excavator 326 D 2 L
Total weight,
30 115 kg
Power,
151,0 kWh
Installation of external engineering networks and communications 
 

It is unthinkable, than residential or industrial building projects could be completed without the work of external engineering networks and external engineering communications. Usually the customer does not skimp on the quality of work and the cost of materials. It is obvious that the engineering networks and communications are held not for a year, ideally, for several decades. Work on installation of external engineering networks and communications require a high skill of the builders.

Work on the external engineering communications and Networks - is a large range of various works from the trays setting up to water supply systems laying (including wells, fields, end walls, shut-off valves).

First of all these works associated with the pipeline.

Before you go lining thermal networks, water pipelines laying, sewer networks laying, it is necessary to clarify the possible occurrence of high-voltage cables and circuit engineering networks and communications near the construction site. We should plan pipelines laying on the shortest direction with a minimum of additional buildings and do not forget the mandatory minimum space between the pipes.

Laying of heating networks can be monotube and multitube. As a rule, in the settlements we use two-pipe heating system, working under the scheme - one pipe delivers heat, and through the other the spent coolant flows back. In recent years pad heating networks of polymeric materials became very popular. Although this is a general trend that applies Heightening demand for water pipelines laying  made of polymeric materials and sewerage networks of polymeric materials laying.

Laying of water supply systems as well as laying the pipeline require any preparatory works: soil analysis, planning ways of laying and much more. If laying of water pipelines is performing underground, pipes, traditionally, are chosen  from cast iron, asbestos cement, steel, and plastics.

Laying of sewerage systems requires the prior determination of the pool drain, sewer network tracing, product hydraulic design, etc. The sewage network complex system. In a sewer system setting up we orient to the average consumption of water in accordance with the selected type of pipes (material, diameter, etc.).


2014 © “Bastau Build Group” Company, Astana, Sh. Aitmatov st., 33. Built-in structure 2
BK.KZ Studio production
Share