  • The hotel Beijing Palace - excavation depth 13.5 meters.
    The hotel "Beijing Palace"- excavation depth 13.5 meters.
  • Multifunctional residential complex Abu Dhabi Plaza - excavation depth 15 meters.
    Multifunctional residential complex "Abu Dhabi Plaza"- excavation depth 15 meters.
  • Underground parking - excavation depth 12 meters.
    Underground parking lot - excavation depth 12 meters.
  • The hotel Beijing Palace - excavation depth 13.5 meters.
    The hotel "Beijing Palace"- excavation depth 13.5 meters.
  • Business Center Moscow- excavation depth 9 meters.
    Business Center "Moscow"- excavation depth 9 meters.
Home / Services / Vertical planning / Catalog

Vertical planning


  • General earthworks
  • «Diaphragm Walling» method
  • Installation of external engineering networks and communications
  • Special equipment services
  • Machinery for rent
  • Vertical planning

Трактор бульдозер гусеничный KOMATSU D65E-12
Трактор бульдозер гусеничный KOMATSU D65E-12
Автогрейдер САТ 160 К
Автогрейдер САТ 160 К
Dozer Caterpillar (CAT) D8R
Dozer Caterpillar (CAT) D8R
Blade width,
3.94-4.98 m
Total weight,
37.8 tons
Power,
328 hp
Track excavator Caterpillar (CAT) 329DL
Track excavator Caterpillar (CAT) 329DL
Total weight,
29.7 tons
Bucket Capacity,
0.94 - 2.6 m3
Dozer Caterpillar D6K XL
Dozer Caterpillar D6K XL
Total weight,
12.89 tons
Power,
127 hp
Drum compactor САТ CS 74 - 16t
Drum compactor САТ CS 74 - 16t
Total weight,
16 000 kg
Dozer Caterpillar D6N
Dozer Caterpillar D6N
Blade width,
(3154-3272)x -XL / 4080x -LGP
Total weight,
16668-XL/17797-LGP
Power,
111,8
Digging depth,
473,5-XL / 359,5-LGP
Track excavator CAT 324DL
Track excavator CAT 324DL
Total weight,
25600 kg
Power,
140 kWh (190 hp)
Bucket Capacity,
1,5 m3
Track excavator Caterpillar 320D
Track excavator Caterpillar 320D
Total weight,
20500-21750 kg
Power,
103 kWh
Excavator 326 D 2 L
Excavator 326 D 2 L
Total weight,
30 115 kg
Power,
151,0 kWh

Vertical planning

Vertical planning of building sites - the most modern and highly efficient method for the preparation of soil for construction, the principle of which is based on a complete reorganization of the structure of the relief. Ordering services of vertical planning such drastic interventions aims favorable terrain for any construction or transportation, regardless of the baseline. An important result of the grading area is a natural abstraction of ground water, which reduces the risks of cleaning the foundations of buildings and mechanical changes of the soil. The vertical layout is considered to be a prerequisite for the successful development of standards.

Vertical planning of area

vert.jpg


LLP «BASTAU BUILD GROUP» provides highly qualified services in the vertical layout and conducts engineering landscaping, using a variety of techniques that are matched with the geophysical features of the site. The primary factor in the success of the plan is a balance of vertical excavation of mass close to zero. This indicator is considered to be the most resistant to dynamic and static loads. Visually, the zero level is determined by the absence of differences in the relief area.

Vertical planning of platform may include a variety of techniques: mitigation relief, cutting the ground in places exceeding the fixed height of the area, bedding soil in the troughs. The result of vertical planning is favorable terrain. Depending on the degree of slope of the ideal addition to a restful relief (0-0.4%) favorable to urban development may be considered conditionally flat relief with a slope of 0.4 to 3% and less crossed (with a slope of 3 to 6%).

The methods and order of performing of area vertical planning

The choice of methods depends not only on relief features, but also from the design stage. There are 3 main ways of the vertical planning area to determine the required level:


  1. Red contour vertical planning method (method of project marks) is that the original plan of the relief (the general plan of the object), designated by contours, corrected by the application of new contours. The purpose of the grading scheme area in the initial phase - determining characteristics of the site and finding out the best overall. Thereafter, in the new scheme there are new contours. The final stage of planning is to develop a cartogram of excavation;

  1. Using project profiles for vertical planning area involves drawing indicates of the direction of the profiles on the grading plan for the site, which is also the common geophysical plan of the site. The distance between the profiles that determine the compensation factor depends on the selected final level. The initial level is denoted by marks on the black profiles, final - red. The complexity of the method of grading the profiles - the price, which is difficult to establish because of the lack of visual cartograms of excavation.

  1. Differentiation of the use of only one of the chosen methods is not necessarily very well-proven combination approach. Vertical planning of the combined method completely justifies the price, because in this case we will not have to take additional measures to prepare the site.